Temporary roof systems
Weather out.
Programme on.
Once the covering's off, every day of rain is a day of risk. A temporary roof turns a weather-dependent job into a controlled one.
Full temporary roofs over renovations, re-roofs and weather-sensitive structural work — designed as one structure with the access scaffold.
Strip a roof and the building, the materials and the deadline are all exposed. A temporary roof keeps the water off so the strip, the rebuild and the finish happen on schedule whatever's coming over the Weald.
We size it from a quick site visit and build it integrated with the access scaffold — one structure, one trade, one point of contact.
From the record
Roofs we've kept dry


The Docket · 60-second quote
Beat the forecast.
Site Notice
- Fully insured — every job, every site
- Five-star rated by our customers
- Free, no-obligation quotes — usually within 24 hours
- CISRS accredited & CITB trained scaffolders